Eskom said its Koeberg power station could have helped reduce load-shedding, had it been timeously returned to service
Eskom CEO Andre de Ryter has also said the country should be in a better position in September 2021, to produce electricity and reduce the power cuts
Eskom made submissions to Parliament’s Standing Committee on Appropriations on Wednesday, 2 September 2020, to give an account of its affairs
It’s just comical, now: Eskom COO Jan Oberholzer believes Mzansi will soon go through the same issue which caused load shedding this weekend.
When the “Eskom Se Push” app doesn’t know what Stage 6 load shedding is, it means trouble. Medupi Power Plant has a new chapter in its history of failure.
The power utility implemented Stage 1 load shedding for Saturday.
Medupi Power Station Unit 3 becoming operational will alleviate pressure on the national grid according to South African power utility Eskom.
There has been “damage of electricity infrastructure”.
That’s right folks, no need to stress about the lights going off for the rest of summer and well into winter; according to Eskom CEO Brian Molefe.
According to the CRL rights commission, graves were disturbed during construction and now a bunch of ghosts are sabotaging the construction of one of the world’s largest coal power stations.